Maps
- Steptoe Corridor - Gage to 10th (PDF, 2.2MB)
Meeting Summaries
- Summary of the first set of Neighborhood Meetings held February 19 and 27, 2006
(PDF, 1.5MB) - Summary of the second set of Neighborhood Meetings held May 17 and 18, 2006
(PDF, 107KB)
Meeting Materials
- For the Open House that preceded a presentation about the Steptoe Street Extension Project and the receipt of public testimony on September 21, 2006, information was displayed at 5 Stations including Sound Abatement, Lighting, Traffic, Environmental, and Potential Designs & Right-of-Way. The following attachments incorporate the information displayed at each Station:
- Station 1 - Sound Abatement (PDF, 734KB)
- Station 2 - Lighting (PDF, 69KB)
- Station 3 - Traffic (PDF, 70KB)
- Station 3 - Traffic - Additional Materials (PDF, 326KB)
- Station 3 - 2008 Traffic Forecasts (PDF, 426KB)
- Station 3 - 2028 Traffic Forecasts (PDF, 464KB)
- Station 4 - Environmental (PDF, 739KB)
- Station 5 - Potential Designs (cross sections & footprint) (PDF, 69KB)
- Agenda (PDF, 42KB)
- Steptoe Cross Section (PDF, 100KB)
- The following Map files represent the 30% Design of the Steptoe Street Extension project from Gage Boulevard to 10th Avenue as presented at the September 21, 2006 Public Meeting. The 30% Design is subject to adjustments as the design proceeds, and as additional information is obtained regarding the project by the City of Kennewick and City of Richland.
- 30% Design (PDF, 5.25MB)
- The Neighborhood Meetings of May 17 and May 18, 2006 were conducted with an open house format. Information was displayed at 5 Stations including Noise, Lighting, Right-of-Way/Traffic, Environmental, and Potential Designs. The following attachments incorporate the information displayed at each Station:
- Station 1 - Noise (PDF, 569KB)
- Station 2 - Lighting (PDF, 5.1MB)
- Station 3 - Right-of-Way Traffic (PDF, 1.3MB)
- Station 4 - Environmental (PDF, 77KB)
- Station 5 - Potential Designs (PDF, 73KB)
- The City of Kennewick and City of Richland presented several design options for the cross-section of the Steptoe Street Extension at the May 17 and May 18, 2006 Neighborhood Meetings. The Cities will be reviewing these cross-sections in the next several weeks to identify a preferred alternate cross-section for presentation to the public at the Public Meeting to be held in August 2006.
- Cross-Sections (PDF, 401KB)
- The following attachments provide information regarding existing average weekday Traffic volumes (Traffic Volume-2005) on roadways throughout the City of Kennewick and the South Richland area; the forecasted weekday peak hour PM Traffic volumes in 2008 with the Steptoe Street Extension project (2008 traffic forecasts); the 2028 forecasted weekday peak hour PM Traffic volumes with the Steptoe Street Extension project, but without the Center Blvd Extension (2028 traffic forecasts wo center); and the 2028 forecasted weekday peak hour PM Traffic volumes with the Steptoe Street Extension project, and the Center Blvd Extension (2028 traffic forecasts).
- 2005 Traffic Volume (PDF, 109KB)
- 2008 Traffic Forecasts (PDF, 380KB)
- 2028 Traffic Forecasts With Steptoe (PDF, 412KB)
- 2028 Traffic Forecasts Without Steptoe (PDF, 412KB)
|
Project Features |